Foundation Bases
Heavy column bases tied and aligned for concrete placement.
Presheva, Serbia
Reinforcement steel teams for foundations, slabs, retaining walls, and heavy concrete structures.
Built for concrete
Veliu Iron Group focuses on the steel work that gives concrete its strength: tied reinforcement, cages, mat foundations, wall grids, column bases, and slab preparation.
The work examples show disciplined spacing, heavy rebar assemblies, and site-ready execution across both residential and larger structural projects.
Recent work
Heavy column bases tied and aligned for concrete placement.
Full-surface mesh work with edge reinforcement and clear pour access.
Continuous wall reinforcement prepared along curved concrete lines.
Prepared cage assemblies for fast, consistent installation on site.
Dense reinforcement grids for larger structural concrete pours.
On-site review, drawings, and practical coordination before installation.
Services
Layout, tying, spacing, and installation for slabs, foundations, columns, and walls.
Prefabricated reinforcement cages and repeatable assemblies for faster site installation.
Mat reinforcement, column bases, edge details, and coordination around formwork.
Practical review with drawings and site conditions so reinforcement is ready before the pour.
Owner
Direct, site-focused leadership for reinforcement teams and concrete preparation work.
Contact
Veliu Iron Group is based in Presheva, Serbia and is open every day from 08:00 to 17:00.